ipolog Planning Adventure - Workspace
- ipolog 4 Workspace Planning Adventure - Project Background
- Program Start: ipolog 4 WS
- ipolog 4 Workspace - Basic Functions: First Steps in ipolog
- 1. Layout Planning
- 1.1 Layout Planning - add stations
- 1.2 Layout Planning - create blocking area
- 1.3 Layout Planning - integration and use of facilities
- 1.4 Layout Planning (advanced) - workingpoint
- 2. Material Planning
- 2.1 Material Planning - changing the approach direction
- 2.2 Material Planning - adjustment of the supply form
- 2.3 Material Planning - arranging material on the rack
- 2.4 Material Planning - moving boxes across racks
- 2.5 Material Planning - visually highlighting load carriers
- 2.6 Material Planning (advanced) - restructuring a station
- 3. Process Planning and Optimization
- 3.1 Process Planning and Optimization - colorizer and moving material
- 3.2 Process Planning and Optimization - shifting processes
- 4. Simulation, Evaluation & Optimization
- 4.1 Simulation, Evaluation & Optimization - cycle time reduction and optimization scenario
- 4.2 Simulation, Evaluation & Optimization - report