The Production Flow View allows to load/reference the planning result of another scenario from another project into the currently opened scenario.
1 | Here you can synchronize the Planning Spaces from the project. The Planning Spaces are displayed in the table below. |
2 | Here you can search for updates. |
3 | Here you can filter for a Planning Space. |
4 |
Here you can select a scenario from the Planning Space (1). |
After selecting a scenario, the area is referenced into the currently opened scenario. This is represented by two opposite arrows (1). Afterwards, shelves, boxes and facilities can be referenced here by clicking on the square (2). Shelves and boxes are displayed as dummies in the 3D view. If a scenario is active, an anchor can be selected via the button "Choose anchor", according to which the area is aligned. To select an anchor, a worker point must exist as a ZoneAnchor to select it as an anchor. This can be done in the TagList Editor. With the button "select Scenario" another scenario can be selected from the Planning Space. (3)
Comments
0 comments
Please sign in to leave a comment.