Under Recalculate transports, the transport simulation can be started and various evaluation options are available.
The report shows the number of means of transport used as a function of time.
In the Gantt chart you can see the individual process steps of a means of transport and the respective departure times.
The order list shows a detailed overview of the transport orders.
Through these various displays and the following submodules, it is possible, among other things, to obtain results for the means of transport and personnel requirements.
Sample Personnel Evaluation (worker type with corresponding layout structure)
The 2D view provides additional analysis tools. By displaying the (dynamic) heatmap or the Sankey diagram, you can obtain further information about the current status of your planning factory.
Dynamic Heatmap (left) und Sankey-Diagram (right)
By clicking on the KPI monitor, you can get an overview of the entire project progress as well as important key figures.
→ Click here for an overview of the evaluation tools in ipolog 4 Material Flow.
Forward to the next step |
Comments
0 comments
Please sign in to leave a comment.