Those release notes are additionally to the release notes of version 4.4.6. The release notes of version 4.4.6. are still valid if nothing else is added here to the description.
ipolog 4 Material Flow
We optimized the performance of order calculation in the view transport simulation. Due to this we have less waiting time after switching in the transport simulation till the transports for the selected simulation day are calculated.
Also the performance for calculating the material provision requirements in the view production data was improved. This improvement can be especially experienced when using the detailed calculation.
After importing a scenario into another system there were several problems such as the container relations to common boxes were not updated correctly. And a reimport of the logistic quantity framework was necessary. With the latest version not reimport is necessary anymore, the container are synchronized directly to the supply chains.
Also the option to to change container dimensions in common boxes will no longer result into inconsistencies in the supply chains or during transport calculation. The container information are now synchronized completely to all parts of ipolog 4 Material Flow.
ipolog 4 Workspace
If the same material was splitted to different material areas, there was a crash if the same material was again placed on the same material area. This crash was solved.
The option to renew placement on selected area is again functional. So the placement of material on a single area is working fine. The placement is according to the placement algorithm of ipolog 4 Workspace.
The crash, that occurred after several reimports of excel files in the view scenario admin, is fixed.