In addition to the basic version, the advanced version now follows:
The economic situation of your company has deteriorated. You sell less than you produce. The management, in consultation with the production manager, therefore decides to increase the cycle time to 350 seconds. This is done against the background that the sales department can sell fewer products and consequently, there are fewer products to produce.
To perform this task, go to Options and increase the cycle time. Afterwards, recalculate everything using the shortcut alt + shift + r.
Now optimize the line with the knowledge learned from the basic version.
The aim of this task is to ensure that the line (as shown in the previous steps) is used as optimally as possible. There is no wrong or right.
Good luck!