The development has announced that in two weeks an underseal will be applied to all products. The underbody protection will be installed at Station_02 and Station_03.
For this reason, you now have the task of providing more space on the assembly line. In order to minimize the stocks on the material surface, the "Just-in-Sequence procedure" should be applied.
Each part to be assembled is provided directly in the product sequence of the production program on the assembly line. This provides the operator with the required material at all times and saves space.
To implement this proposal, first open the Table Editor.
Select the Delivery-Type(1) tab and enter "SEQ1" in the text field "Sequence"(2) for all undercarriages at the rear right, "SEQ2" at the rear left, "SEQ3" at the front right and "SEQ4" at the front left.
The filter function of the Table Editor can aid you in finding the corresponding material.
Please make sure that "Box Count" now has one box everywhere, so that in the 3D view exactly one box is displayed for each chassis part.
Save your progress with the button in the upper right corner of the screen.
Comments
0 comments
Please sign in to leave a comment.